Risk
|
Level of Risk (1
being unlikely, 2 being a possibility and 3 being likely)
|
Course of action to
prevent risk
|
Camera runs out of battery
|
2
|
I will bring a back up portable camera with me in case the
main camera does not work or runs out of battery. I have a battery charger so
will make sure that the camera is fully charged before the shoot.
|
Bad weather
|
3
|
This is something that I have no control over and will be
a major issue because my shoot is all outdoors. Unfortunately, this means I
am going to have to rely on luck on the day of the shoot but will need to
check the weather forecast on the day of the shoot and decided whether to
reschedule or not.
|
Cast or crew can not attend shoot
|
1
|
The cast and crew may have other priorities, which may
mean that they cannot attend a shoot. There is also the possibility that they
get ill or another problem occurs which means that they cannot come to the
shoot. To prevent this risk as much as possible, I will contact the cast and
crew asking which days they are available to shoot to fit in with them.
Therefore, there is more likelihood of them turning up to the shoot. I will
also notify the cast and crew the day before and the day of the shoot.
|
Thursday, 13 November 2014
Risk Assessment
I have made a risk assessment as a way of showing my preparation for possible problems that could occur. I have evaluated the likelihood of the issues happening and the precautions that should be taken.